Starting the Kitchen

The guys have almost finished the bedroom. The closets are done except for staining and sealing the shelves. And the electrical has not been installed. I'm planning on 110 volt outlets at the head of the bed. The lights will be 12 volt LED strips in front of the closets.

Passenger side shelves for clothes and such

The closet rod is not up yet. The space between the wall and ceiling will be cedar planking, but maybe last.

Driver side closet hanging rod and shelves

The bathroom is almost finished too. Just lacking the trim at the top, light and a little more stain and seal. You can't see the floor in the bathroom because the kitchen counter top is leaning here.

Composting toilet drivers side


The shower and electrical closet are coming along. The shower needs the plastic wall panels and lights.  The batteries and inverter/charger are in place.


Electrical closet next to shower.


The start of the kitchen counter and cabinets. The counter top and breakfast bar higher, with the back splash being even with the center of the windows. That's the on-demand hot water heater in the floor. The water pump and pressure tank are in the back of the electrical closet.

Start of the framing for the kitchen


A video tour, part one: